From Assessment to Analysis. Seamlessly.

Implementation

Implementation is often the bottleneck in setting up a digital twin.

Anessa doesn’t replace your SCADA or CMMS. It brings data from your existing systems into one platform alongside our models.

From connecting to your plant systems to going live, Anessa handles everything end-to-end, without disrupting operations.


Project goes live within

12 months


What it does

We run the implementation. Anessa's team handles the connection to your existing systems with our technology

Existing data is the starting point. The platform is built to work with your existing data, not the dataset you'd need for the ideal scenario. Inconsistencies are flagged and worked around during connection

Start with one plant, not the whole fleet. A single-plant starter engagement lets your team see the platform working on real data before any fleet-wide commitment.

Data is visualized into role-based dashboards.

  • An operator oversees operational data.

  • An engineer sees biology and trends.

  • A CFO sees production against budget, feedstock cost, and P&L metrics

Single source of data. Different access levels.

Users, site assignments, and permission roles; all managed from one screen.



Steps for Implementation

Depending on project scope, an average project runs through three steps:

Full integration averages between 10-12 months for a typical European biogas plant, depending on scope, from a single-site starter engagement through to a fully deployed, multi-site setup.